Search Results for: project manager

As America’s top steel building manufacturer, we are not just committed to bringing the best products for your business or personal use. We also work closely with every customer to help them get the right steel metal building kits according to their application, budget, and unique requirements. At Armstrong Steel, we want to ensure that our customers can make informed decisions throughout their entire construction process—from when they start exploring our kits to purchasing and beyond.

Get a quote

We recommend getting a quote from at least two different manufacturers of steel metal building kits, including us, so you can compare our offers. Our in-house experts at Armstrong Steel will crunch your numbers to show how much you can save with our systems. It only takes a few minutes to price your building online and review your custom pricing on the spot. And we only need a few details to get started, such as:

  • Your building location – This is to ensure accurate pricing. At Armstrong Steel, we engineer every steel metal building kit according to your local building codes and loads.
  • Size – Choose the building’s height, length, and width. We have years of experience designing and building custom pre-engineered metal building systems and offer different framing systems for any application.
  • Your general building design – Are you worried about your steel building looking too industrial or like a warehouse? Our metal buildings are customizable in different trim or wall colors and other construction materials to suit your aesthetic requirements.

Many customers choose steel metal building kits based solely on price. Cost is certainly an important consideration, but it’s also important to look beyond it. As specialists in metal buildings, we can offer insights from the industry that will help you select the most suitable metal building kit for your needs.

Find out if you’re eligible for direct pricing.

Buying directly can offer you significant savings in time and money, particularly if your project involves acquiring additional building components like insulation, doors, and windows. This opportunity—once exclusive to larger contractors—is now available to everyone through Armstrong Steel’s Direct Buy program. Our project managers invest time in meticulously designing steel metal building kits to ensure the highest quality outcomes.

You may be qualified if:

  • Your job site is construction-ready
  • Your build schedule coincides with a gap in ours (especially during the winter)

We recommend that you pay an engineering fee upon placing your order to access our Factory Direct Buy program benefits. It’s essential to accept our delivery on time. That said, we understand that flexibility is key, so please talk to your project manager about the possibility of delaying delivery if special circumstances arise.

Steel prices can affect the cost of your building.

Did you know there is no standard price for steel metal building kits? This is because of rising and fluctuating steel prices. Ultimately, the price of your metal building is impacted by these factors:

  • Oil and gas prices
  • Global production
  • Current market conditions
  • China’s influence on steel manufacturing and use
  • Supply and demand

Despite these factors, we have the luxury of offering steel metal building kits at highly competitive rates. Many of our customers find our prices generally lower than what they would have to spend if they built with conventional construction methods.

Purchasing options

Our status as the number 1 manufacturer of steel metal building kits in the US allows us to work with different customers who have unique needs and circumstances. Some know the technical side and challenges of contracting and can do everything on their own, but others are new to handling a building project. As such, we offer our expertise and knowledge to anyone who needs our help. Plus, we have different purchasing options to suit every customer.

  • Direct Buy program – This option eliminates the middleman and lets you manage some or all aspects of your steel building and get discounts. It’s ideal for many builders and DIY enthusiasts. Just be sure to talk to our steel building experts to know if you qualify!
  • Retail purchase – Our steel metal building kitsare available for retail purchase to various customers, including first-time builders and DIYers. We recommend this to anyone who already knows what they want from their structure but doesn’t have time to oversee certain aspects of the project. If this is you, our Building Expert has your back. They will work with you to identify your exact needs before selecting the best windows and doors. Then, you can place your order and coordinate with our delivery department to schedule a date that’s best for you.

What do you want to build?

No matter the scale of your project, we are confident in our ability to provide the right steel metal building kits for it. Check out some samples here, and don’t hesitate to call 1-866-529-4568 for more options. Our Building Experts are also ready to help you!

Search Results for: project manager

Armstrong Steel Corporation emerged with a vision to save people money and enhance their lives through quality steel-building solutions. Catering to business owners, builders, engineers, and architects across the United States, Central America, and Canada, we stand out for offering top-tier commercial steel buildings at competitive prices. This commitment to affordability without compromising quality positions our commercial steel buildings as a wise investment for anyone in the market.

Here are the reasons why Armstrong Steel’s commercial steel buildings make smart investments:

Reason #1: Armstrong Steel buildings surpass conventional construction.

Unlike traditional construction methods, we focus on continuous design improvement, ensuring that every component of our commercial steel buildings—from the structural members to connection plates and welds—meets the highest standards. This dedication to excellence is evident once the buildings are erected.

Armstrong Steel’s commercial steel buildings also come with some of the most extensive warranties you will ever see, including a 50-year structural warranty, a 40-year paint warranty, and a 35-year roof warranty—far exceeding what conventional construction offers. These guarantees reflect the durability and quality of Armstrong’s commercial steel buildings, ensuring long-term satisfaction and security for investors.

Reason #2: We offer direct pricing.

Historically, direct access to steel and pre-engineered building systems was limited to large contractors. Armstrong Steel revolutionized this by offering a Direct Buy program, making commercial steel buildings more accessible to a wider range of buyers. This program allows for direct collaboration with project managers to ensure fair and realistic project planning, with the potential for special pricing under certain conditions.

Our Direct Buy program is specifically designed for those with ready-to-go job sites. Our project managers are eager to work closely with you to design your building to accurately reflect your project’s specific needs. If your project site is ready for construction or if it neatly fits into our scheduling gaps (like during winter), you might just score some special pricing.

To join the Armstrong Factory Direct Buy program, you’ll need to pay an engineering fee to kickstart your steel order and agree to accept your building on schedule.

You’re probably qualified for the program if:

  • Your financing is already arranged,
  • You have a clear vision of your project,
  • You’ve got the land or a spot to store your building materials,
  • You’re all set to make an engineering payment to lock in your steel order and dive into the design phase with your project manager.

If you don’t tick all these boxes, don’t worry—you might still make the cut. Call us at 866-927-4083 to explore your options.

Reason #3: We manufacture the highest quality PEMB system in the world.

At Armstrong Steel, we prioritize excellence in every aspect of our commercial steel building solutions, and it’s this commitment to quality that sets us apart in the industry. Our dedication to delivering the highest quality PEMB (Pre-Engineered Metal Building) system stems from our relentless pursuit of innovation and perfection.

Central to our PEMB system is our I-beam construction, which offers unparalleled strength and durability. Combined with pre-galvanized secondary framing, our buildings are engineered to withstand the test of time, ensuring longevity and structural integrity even in the most demanding environments.

Moreover, our utilization of 26-gauge PBR panels further enhances the resilience of our buildings, providing superior protection against the elements while maintaining aesthetic appeal. With Armstrong Steel, customers can trust that their investment will not only meet but exceed industry standards.

One of the hallmarks of Armstrong Steel is our comprehensive in-house engineering capabilities. By leveraging the expertise of our seasoned professionals, we tailor each project to meet the unique needs and specifications of our clients. This personalized approach not only ensures optimal performance but also streamlines the construction process, saving time and minimizing costs.

Furthermore, our commitment to quality extends beyond the materials and engineering of our buildings. We go the extra mile by incorporating pre-welded clips and long-life fasteners, as well as pre-punched holes, facilitating efficient assembly and installation. This attention to detail not only enhances the overall efficiency of the construction process but also contributes to the longevity and reliability of our buildings.

At Armstrong Steel, we understand that a commercial steel building is a significant investment, which is why we stand behind our products with the longest warranties in the industry. Our goal is to provide our customers with peace of mind, knowing that their investment is protected for years to come.

Save money on your commercial steel building today.

Choosing Armstrong Steel for your commercial steel buildings is not just an investment in a physical structure—it’s also a decision to invest in quality and durability. From superior construction standards and warranties to direct pricing and price locking, we ensure that every client receives the best value for their investment.

Ready to save thousands by buying your metal or steel building directly from Armstrong? Begin the process by getting a quote within minutes. To do this, simply:

  • Specify your intended building location for precise pricing
  • Give us details on the building’s width, length, and height
  • Any other relevant initial building design information

That’s it—you will get your pricing. Click here to start.

Search Results for: project manager

Armstrong Steel’s commercial steel building kits have become a favored option for business owners looking to construct their own operational facilities efficiently and affordably. We specialize in providing high-quality pre-engineered metal structures suitable for a wide array of commercial uses, including medical clinics, vehicle dealerships, strip malls, retail stores, storage facilities, office buildings, restaurants, and shopping centers. Our expert team of in-house project managers and building consultants collaborates with each client to plan and design the ideal structure. Regardless of the building size or type you envision, we aim to realize it affordably and back every project with robust warranties for your peace of mind.

How to buy and build commercial steel building kits

Navigating the process of purchasing and constructing commercial steel building kits can be complex, especially if this is your first time building a steel structure. Our step-by-step guide below is designed to simplify this process, helping you effectively plan and construct your pre-engineered commercial metal building. This guide outlines the crucial steps for customizing and assembling our kits, ensuring that your project progresses smoothly and efficiently:

Step 1: Identify your requirements.

This forms the base of your entire project. Taking the time to comprehensively assess your requirements will help avoid unnecessary expenses, time delays, and complications later on. Key aspects to consider include:

  • Purpose of the building – Define the primary use of your building. Is it going to serve as a warehouse, retail outlet, office, or something different? Knowing its purpose will guide you in deciding on the appropriate size, layout, and essential features.
  • Size requirements – Evaluate how much space is necessary. Consider factors such as inventory storage, employee workspace, or equipment usage. Also, think ahead about future growth and the possibility of needing more space.
  • Budgeting – Establish a realistic budget, factoring in all expenses, including the kit cost, foundation laying, installation, permits, and any extra features.
  • Permits and regulations – Familiarize yourself with local building codes and zoning laws relevant to your project. Understanding these regulations will help you identify the necessary permits and any limitations on building specifications.
  • Desired features and functionality – Determine the specific features and amenities you require, such as door types, window placements, insulation quality, ventilation systems, and utilities like electrical and plumbing. Also, consider energy efficiency, sustainability factors, and any unique safety requirements pertinent to your field.
  • Site characteristics – Assess your construction site’s features, including soil quality, drainage capacity, and accessibility of construction equipment and utility connections. This assessment will inform you about the type of foundation required and any site preparation that needs to be done.

By thoroughly evaluating these elements, you’ll have a clear understanding of your requirements, ensuring your commercial steel building kit fulfills your expectations.

Step 2: Ask about your direct buy eligibility.

In the past, pre-engineered building systems in the US were primarily only accessible to large contractors. At Armstrong Steel, we’ve shifted from this model and now offer a Direct Buy program suitable for clients with a prepared job site. This opens up opportunities for a wider range of clients, including smaller businesses and individuals. Our project managers still personalize each building to the unique aspects of your project, offering special pricing for well-timed projects.

This program is ideal for those ready to move forward quickly with their construction plans.

Step 3: Obtain a quote.

Requesting a quote for our commercial steel building kits is straightforward and free, whether done online or over the phone. It takes just minutes to design your building and receive an accurate estimate. You can use this website or call 1-800-345-4610.

Step 4: Place your order.

Once we receive your order, you’ll be assigned a project manager, and our detailing, drafting, and engineering teams will create your custom, one-off approval drawings. This marks the beginning of your project’s visualization phase.

Step 5: Review the drawings.

Check the drawings we sent (you can request hard copies if needed). If the drawings match your vision, use the provided form to approve them. For any changes, use red ink to mark the drawings and communicate the alterations to your project manager. This feedback is crucial in ensuring the final design aligns with your needs.

Our Project Managers are available to help you add or modify features such as doors, windows, ridge vents, cupolas, and insulation. They are available to guide you through the process of personalizing your building’s features.

Step 6: Accept the drawings.

After finalizing your commercial steel building kits, sign the approval acceptance form. Our team will then prepare permit drawings and forward them to you, along with a fabrication release form and color selection form.

Upon receiving the fabrication release, our teams will produce detailed drawings for both fabrication and erection, along with a shipping list of individual parts. This comprehensive documentation ensures all components are accounted for and ready for construction.

Step 8: Prepare for delivery.

We’ll confirm your delivery date and send relevant documents. You’ll be expected to pay your outstanding COD balance in advance via certified funds to avoid any delays.

Step 9: Begin construction.

Our commercial steel building kits are designed for easy assembly and erection, with all necessary instructions and guides. Our team is available to assist if you encounter any challenges during construction.

Order your commercial steel building kits today.

For further inquiries or to start building your commercial metal structure, contact us at 1-800-345-4610 or request a quote on our website. With Armstrong Steel, you’re investing in a high-quality, cost-effective solution that’s built to last.

Search Results for: project manager

As America’s number 1 steel building manufacturer, we at Armstrong Steel are challenging design rules with pre-engineered metal buildings that meet residential requirements.

Our pre-engineered metal buildings aren’t just for commercial purposes—they’re also perfect for creating personal spaces, including fully functional and stylish homes. Whether you’re aiming to build a modest house or an innovative barndominium, our metal structures offer incredible design flexibility, long-term value, and unparalleled strength. This versatility has made our residential metal homes a top choice for various purposes.

If you’re dreaming of building a unique home, an Armstrong Steel building system could be the perfect solution. Read on to learn how we tailor our structures to fit any residential space, customized to your lifestyle and specific requirements.

The growing appeal of residential metal homes

The popularity of residential metal homes is on the rise due to their exceptional characteristics. These homes are notably durable, easily withstanding harsh weather conditions and pest infestations. People who are environmentally conscious also find these homes appealing because of their sustainable nature and the reduced waste and time associated with their prefabrication.

What’s more, residential metal homes are more energy efficient. The cost-effectiveness and minimal upkeep requirements further enhance their attractiveness. These comprehensive benefits make them an attractive option for those seeking a modern, efficient, and eco-friendly dwelling.

Transforming steel buildings into cozy and attractive homes may seem challenging, but our experience in customizing steel structures has allowed us to master this art. We’ve significantly contributed to the popularity of residential metal homes by offering designs that are not only trendy but also affordable. These homes are tailored to align with each homeowner’s specific needs and lifestyle, making them a valuable choice for diverse residential applications.

Building quality, long-lasting homes

Armstrong Steel building systems deliver quality construction that guarantees durable and long-lasting homes that meet the safety and efficiency requirements expected from modern residences. We work closely with you, transforming your design ideas into tangible, livable, and beautiful spaces. The cost-effectiveness and adaptability of our steel buildings make them ideal for homeowners and builders seeking affordable yet high-quality housing solutions.

Creating any space you envision

If you can imagine your dream home, we can build it. Our consultants have extensive experience in turning every vision into reality, crafting unrestricted spaces with flexible floor plans. Our clear span design lets you maximize interior height. By working with us, you can save time and money while accelerating the completion of your home.

Our residential metal homes offer incredible flexibility in finish and style. Whether you’re envisioning a specific roof or wall design, we can accommodate it, ensuring your home doesn’t resemble an industrial building and feels much more residential. We can integrate various materials like metal panels, CMU, shingles, brick, and stucco into your home’s design.

We offer a wide range of layout and size customizations, and we always encourage you to tailor your steel home to meet your unique needs. Our team is dedicated to helping you create your dream space with Armstrong Steel building systems!

Practical tips on designing your residential metal home

Our steel building kits are customizable to fit your location and aesthetic preferences. They are designed to seamlessly blend with your environment while reflecting your personal style.

Need guidance in getting started? Here are some tips for designing your residential metal home with us:

  • Understand your needs – Consider the purpose of your dream home to determine the right size, features, and layout. What activities will each place serve? Consider factors like zoning regulations, local building codes, visibility, and accessibility. Think about future expansions or modifications. We factor in all these elements when pricing residential metal homes.
  • Set a realistic budget – Clearly define your budget to ensure we design a structure that meets your requirements without overspending. Be transparent about your financial capacity and priorities. The cost of metal structures varies, but we work with you to create a solution within your budget.
  • Review and customize our designs – Our design team will send you approval drawings for review. Use red ink to mark any desired changes. This can include modifications to openings, eave extensions, building dimensions, and more. We can assist you when choosing insulation, ridge vents, and other features, with your project manager ready to guide you through the process. Make sure every aspect reflects your vision and practical needs.
  • Focus on energy efficiency – Steel frame homes are excellent for insulation, boosting energy efficiency, and saving on heating and cooling costs. Consider the local climate and insulation needs. Our kits can accommodate various insulation types to enhance your home’s energy efficiency. By optimizing energy use, you can reduce your long-term costs and environmental footprint.

Why build your residential metal home with Armstrong Steel?

Our residential metal homes are a cut above the rest. We use only the highest quality materials and offer customization options for colors on walls, roofs, and trims. Each project is meticulously designed, and we assign a dedicated project manager to oversee it at no extra cost. Our warranties—40 years for paint, 35 years for the Galvalume roof, and 50 years for the I-beam structure—ensure that you can enjoy your steel home worry-free for many years.

If you’re ready to embark on building your metal home, request a free quote on our website today. You can also call us at 1-800-345-4610 for any inquiries about building residential metal homes. Let Armstrong Steel be your partner in creating a home that’s not just a living space but a reflection of your unique style and requirements.

Search Results for: project manager

At Armstrong Steel, we are experts in creating pre-engineered steel building systems for a variety of applications, including metal garage buildings. Our approach combines state-of-the-art technology with customized design to ensure each garage meets our customers’ specific needs.

Whether it’s for storing vehicles, setting up auto workshops, or housing impressive car collections, we understand that metal garage buildings have to be purpose-built. This requires meticulous planning and precise execution.

In this comprehensive guide, we’ll explore various innovative applications for metal garages and offer practical construction tips to help you create the perfect structure tailored to your unique requirements.

Creative ways to use metal garage buildings

While the main purpose of a metal garage is to house, park, and secure vehicles, their versatility and adaptability make them useful for so many other applications. Metal garage buildings are incredibly versatile and customizable structures that can also be used as:

  • Farm equipment storage – They provide a secure and spacious environment for storing tractors, harvesters, and other large farming tools.
  • RV shelters – Tailored to protect recreational vehicles from the elements, these garages can be designed with specific height and width requirements.
  • Personal workshops – Ideal for hobbyists or professionals who need a dedicated space for woodworking, metalworking, or other crafts.
  • Vehicle storage – Perfect for safely housing everyday cars as well as collectible models, providing both security and protection from weather damage.
  • Creative studios – Artists and musicians can transform these spaces into vibrant studios for painting, sculpture, or music production.
  • Entertainment areas – Metal garages can be converted into additional living spaces for hosting gatherings, parties, or as a private retreat.

Why is a metal garage building the superior choice?

Garages have traditionally been built using materials like wood, concrete, and brick. However, these materials may not offer the longevity, durability, and reliability that a metal garage building can provide. Here’s why choosing a metal for your garage structure may be the better choice:

  • Flexibility in design – Pre-engineered metal garages offer customizable layouts, accommodating wider and taller door openings to suit various requirements.
  • Speed and ease of construction – These buildings are quick to erect, significantly reducing construction time and costs.
  • Durability and low maintenance – Metal garages withstand harsh weather conditions—from hurricanes to heavy snowfalls—ensuring the safety of your assets with minimal maintenance.
  • Cost-effective over time – The initial investment in a metal garage building often results in long-term savings, thanks to their sturdy construction and energy efficiency.

Tips on constructing your metal garage building

Building a metal garage with Armstrong Steel is a straightforward process. Our metal garage kits are shipped with everything needed for assembly, including detailed drawings, guides, and pre-fabricated components.

Need guidance on where to start? Here are some key steps and tips to consider when constructing your metal garage building:

  • Determine the right size – Begin by assessing the square footage needed for your metal garage. Consider the immediate and future uses of the space to determine the ideal size. Factor in the type of activities you plan to conduct, such as vehicle maintenance, woodworking, or storing large equipment.
  • Consult with experts – Reach out to us with your preliminary ideas. Our team of building experts will provide you with a detailed estimate, discuss your specific needs, and guide you through the purchase process of our metal garage buildings.
  • Customize your design – Upon placing your order, our drafting and engineering team will prepare approval drawings. Review these drawings carefully, marking any desired changes to ensure the final design aligns with your vision.
  • Engage in the design process – We encourage active participation during the design phase. Utilize our catalog to choose from a variety of features, such as insulation options, ventilation systems, and aesthetic enhancements. A project manager will be assigned to assist you throughout this process.
  • Consider a detached garage – If space permits, a detached metal garage can offer more flexibility in terms of design and usage. It allows for privacy, reduces noise and fumes, and provides opportunities for future expansion.
  • Prepare the site – Before construction begins, ensure that the site is properly prepared. This includes clearing the land, leveling the ground, and making sure that the foundation is ready for the structure.
  • Follow the assembly guide – Utilize the detailed assembly guide provided to construct your metal garage. Our pre-punched and numbered components make the process intuitive and efficient.
  • Inspect and secure the structure – After assembly, thoroughly inspect the structure to ensure everything is securely in place. Pay special attention to doors and windows to ensure they are properly sealed and functional.
  • Customize the interior – Once the structure is up, you can start customizing the interior. Whether it’s installing shelves, workbenches, or lighting, you can tailor the space to suit your specific needs.
  • Maintain your metal garage – Regular maintenance will ensure your metal garage remains in top condition. This includes checking for any signs of wear and tear, ensuring the structural integrity, and keeping the building clean.

Ready to build your dream metal garage?

Constructing a metal garage can be exciting but also complex. You need detailed planning, a clear understanding of your requirements, and a reliable construction process.

With Armstrong Steel, you have a partner ready to guide you every step of the way. From initial consultation to the final touches, we are dedicated to helping you realize your vision.

If you’re ready to start designing your metal garage building, contact us for a quote or further information. Reach out at 1-800-345-4610 or visit our website to begin the exciting process of creating your ideal metal garage space.

Search Results for: project manager

Pre-engineered steel buildings offer more benefits to those looking to build a home or a commercial structure quickly and cost-effectively. Compared to conventional wooden or concrete structures, they are more cost-effective, easier to customize, and easier to erect. As metal building fabricators, we engineer every residential or commercial steel building based on local load requirements and building codes. This saves builders a lot of time and prevents problems during erection.

The many benefits of pre-engineered steel buildings

These custom buildings are shipped to you ready to assemble, complete with detailed assembly drawings, erection guide, and anchor bolt patterns. Rest assured that we have numbered and pre-cut most components to correspond with the drawings, and holes are already pre-punched on major connections.

At Armstrong Steel, our engineers consider the customer’s customizations, local load, building codes, and environmental factors to ensure a highly reliable and durable structure. Moreover, we fabricate all the components in our facility, including the metal roofing system, wall panels, structural frame, and other essential accessories, and then we ship these products to the customer’s site, ready to assemble.

Ultimately, pre-engineered steel buildings save you money and time while avoiding the stress involved in traditional construction, whether for commercial or residential use. Keep reading to learn more benefits that make these structures better than traditional buildings.

Designed for your purpose

Versatility is another reason to choose metal buildings for residential and commercial construction. We have extensive experience in customizing our structures for any purpose, including steel homes, barndominiums, strip malls, restaurants, motor vehicle dealerships, retail stores, medical clinics, office buildings, and storage facilities. No matter the purpose, our in-house project managers and building consultants will coordinate with you every step of the way to make sure the structure meets your requirements.

Cost-effective

In today’s economy, constructing a home or commercial structure presents even more challenges. Recognizing this, more people are turning to alternative building methods. Steel buildings offer a cost-effective solution because they are easily adaptable for residential or business purposes. Our expertise lies in designing steel structures with flexible floor plans to enable efficient use of space. Additionally, our clear-span designs enhance the interior height of the buildings, maximizing their utility.

From the outset, our engineering and design teams work closely with each customer. This collaboration ensures the creation of a custom steel building system tailored to the desired dimensions and equipped with all necessary features. These may include modular or clearspan framing systems and larger door openings, among others. By fabricating everything in-house, we optimize material usage, minimizing costs associated with excess materials and waste.

Time savings

Delays in construction projects can cost you more than you think. This is why successful contractors carefully plan their timing and labor. Our steel building solutions significantly reduce construction timeframes. Pre-engineered metal buildings are ready to assemble and erect as soon as they are delivered to your site. Plus, the pre-punched connections, assembly instructions, and numbered components streamline erection and reduce labor costs.

Durability

The durability of pre-engineered steel buildings is another key factor in their cost-effectiveness. These structures require minimal maintenance and are capable of withstanding extreme weather conditions and natural disasters, including earthquakes, heavy snow, and high winds. To further enhance their longevity, we can apply a coating of galvalume to the steel roof panels. This reliable aluminum compound extends the lifespan of the panels and prevents rusting.

The durability of these buildings also means less frequent repairs or replacements, making them a wise long-term investment. Additionally, being non-combustible, steel buildings offer increased safety in the event of a fire as they are less likely to burn down.

For both residential and commercial structures, these durability features can lead to lower insurance premiums. Steel buildings are less prone to damage than traditional structures, resulting in lower risks for insurers. They are also resistant to termites and other damaging pests, eliminating the need for costly pest control and repairs.

Custom design to meet your needs

Our in-house engineering staff and building consultants work to save you both money and time when it comes to designing your building for finish work. We can ensure that the finished structure doesn’t resemble a warehouse or industrial building. Our approach differs from our competitors in that we don’t rely on generic standards. We are dedicated to each customer, ensuring that each building meets your specific needs.

Backed by warranties

At Armstrong Steel, we like to stand behind the quality of our work. This is why we offer decades-long warranties that allow you to enjoy and make the most of steel buildings without any worries. Below are some of the warranties that make our pre-engineered metal structures stand out:

  • 50-year structural warranty
  • 35-year rust through perforation roof warranty
  • 40-year paint warranty

Energy savings

Proper insulation will increase the energy efficiency of any structure. Unlike wood frame structures, our pre-engineered steel buildings are easy to insulate. This feature allows you to improve the energy efficiency of your home or business, leading to substantial savings on cooling and heating costs over the building’s lifespan.

If you’re now considering prefabricated steel buildings for your next project, we invite you to connect with us at Armstrong Steel Building Systems. Contact us for a complimentary quote, and let us assist you in planning your project. We are committed to delivering custom steel buildings tailored to your specific needs, ensuring you get the quality and efficiency you seek.

Search Results for: project manager

Get Your Steel Building Quote In Minutes:

4.9 out of 5
Average Satisfaction Rating

Buying a Steel Building Direct

Buying a pre-engineered steel building system is an exciting purchase, and to some, a symbol of achievement. Building is more than just a financial investment — it is an investment in ownership, in business and in the future. Owning a building is a significant step toward achieving the American Dream.

Equipping yourself with all available resources will help you prepare to move forward in the steel building process. Although the nature of any building purchase can cause a certain level of anxiety, we at Armstrong Steel make the process as easy as possible. After all, it's not every day that you buy a building. You should enjoy the experience!

The Direct Buy Process

Step 1: Getting Started

process stepone

Getting started at Armstrong Steel is as simple as filling out our quick and secure contact form. Once you’ve completed our contact form, one of our Building Experts will reach out to you to discuss your unique needs, your objectives and how we can help you purchase a building with Armstrong Steel.

Determining your needs and putting a price on what you plan to build is important because it gives you an estimate of how much building you can afford while laying a foundation for the purchasing process moving forward. Our Building Experts will be able to tell you immediately whether or not an Armstrong Steel Building System is a right fit for you at this time or not.

Even if you aren’t sure of exactly the dimensions of what you need, don’t worry, we have the resources in place to guide you on your path to purchasing your building.

Step 2: Place Your Order

place you orderOnce you've placed your order, Armstrong's engineering and detailing/drafting team will begin working on your approval drawings that will need to be approved by you, our customer.

Generally, drawings are submitted to the customer via email within 5 business days after the order has been placed. This of course can take more or less time depending on building complexity and project backlog. If at anytime you need to know about the status of your order please contact your project manager.

What needs to be done by you:

  • Nothing! Sit back and enjoy your week while Armstrong works on your project.

Important note about your Purchase Order

If your purchase order has been marked "Fabrication Order" on the purchase agreement please skip forward to step 5. You signed your fabrication release when you purchased your building and Armstrong is working on your drawings to be used for permitting and construction. Your order has been expedited and will be shipped as soon as possible. If you order was marked as an "Approval Order" or a "Permit Order", please continue to Step 3.

Step 3: Approval Drawings & Mark-Up

Approval Drawings & Mark-Up

At this point you will have received your project's approval drawings for you to review via email. If you would like hard copies to be mailed, contact your project manager and he/she can arrange it (there may be a printing and mailing fee charged). Here you have two options:

Option 1:
Use the form that was supplied with the approval drawings to approve the drawings as they are. If you do not receive an approval drawing acceptance form with the drawings, please contact your project manager to receive one.

NOTE: If you need to make changes to your Armstrong Building do not sign the acceptance form and proceed to Option 2.

Option 2:
Mark-up your drawings in red ink showing any modifications you need to make to your building and send to your project manager. You can print the drawings off and do this by hand or use a computer program. It is best to use red ink for writing and drawing on the plans that are to be revised, this way your project manager will be less likely to miss a desired change. You may change, add or remove openings, doors, windows. You can change eave extensions, building dimensions, bay spacing, etc... You may add insulation, cupolas, ridge vents, or anything that is offered in the Armstrong Steel Dealer Catalog. If you need to make changes to the drawings but cannot mark up the drawings contact your project manager and they will help you over the phone.

Once your project manager receives and reviews your requested changes they will estimate any additional costs/credits and create a change order document and a set of preliminary drawings (preliminary drawings are not Approval Drawings and are used only to clarify change orders) for you to review and either accept or modify. Now that the change order has been accepted your project will go back to engineering to have a set of revised approval drawings drafted for you review and acceptance. At this time Step 2 starts from the beginning. Armstrong will revise approval drawings only twice free of charge. So if you must mark-up the revised approval drawings make sure that you get everything done on the first or second set of mark-ups.

What needs to be done by you:

  • Mark-up, Review and/or Approve your drawings.

NOTE: Your project will not move to step 4 until you have signed off on either approval or revised approval drawings by using the Approval Acceptance Form.

Step 4: Permit Drawings

Permit Drawings

After the approval process has been completed and Armstrong has received your signed approval acceptance form. Armstrong's engineering and drafting team will begin working on your permit drawings. Permit drawings are emailed to you and three original sets are mailed. These drawings are sealed and signed by an Armstrong Steel Engineer licensed in your state and are to be used for the permitting process. Accompanying these drawings is another form that you will need to review and sign off on prior to your building being fabricated and delivered. This form is the Fabrication Release Form and requires your direct attention.

If you have not already chosen your buildings colors now is the time to do so. Color Chips were sent to you via USPS when you first bought your building. Contact your project manager should you have any questions or need to receive a "Color Selection" form.

What needs to be done by you:

  • Read and sign off on your fabrication release form.
  • Fill out the color selection form.

NOTE: Your project will not move to step 5 until you have signed off on the Fabrication Release Form.

Important: Read the fabrication release form before signing it!

Step 5: Construction Drawings

Construction Drawings

Once Armstrong receives your fabrication release form the Armstrong Steel engineering and detailing team will begin working on the drawings to be used by the shop (shop drawings) during fabrication, a set of construction drawings to be used by the building erector (maybe you!) and a shipping list of all individual parts (beams, rafters, girts, trims, nuts and bolts, screws, etc...).

Once these drawings are complete and Armstrong schedules fabrication and delivery, our accounts department will send out a finalized account summary that will show all deposits paid on the building, any change orders, any additional fees and taxes. If you are tax exempt you will at this time send in your tax exemption to the accounts department. Once your account summary is accepted Armstrong will schedule delivery.

What needs to be done by you:

  • Review and sign off on your account summary.

NOTE: Your project will not move to step 6 until you have signed off on the Account Summary Form.

Step 7: Delivery Documents

Delivery Documents

Once Armstrong Steel has determined your delivery date, our shipping department will send you the delivery documents notifying you of your delivery date. These dates are tentative and may change. Armstrong Steel will endeavor to keep you informed of any potential delay.

What needs to be done by you:

  • Keep drinking, this one is us too!

Step 8: Delivery

Delivery

When your building arrives you will need to pay the C.O.D. amount via certified funds to the truck driver prior to unloading the building. For export jobs including Alaska and Hawaii payment will be made prior to shipment. You will need to have a fork lift on site to unload the building members which our shipping department will go over in detail with you prior to delivery.

What needs to be done by you:

  • Pay for your COD
  • Unload your new building from the truck
  • Check for inventory accuracy & any shipping damage

Step 9: Construction

Construction

Now that the building has been delivered the process of buying and taking delivery of your Armstrong Building has been completed and the contract is now fulfilled by both parties. Congratulations!

However, Armstrong Steel is still there for you if you need help with erection. Our staff is prepared and happy to answer any questions concerning any aspect of your new buildings erection. Because Armstrong's engineers and designers work right here out of our corporate headquarters in the USA, you are only a phone call away from speaking directly with the person that has first hand knowledge of your buildings design, trims, drawings, etc...

Search Results for: project manager

Thank You

We’ve sent you some initial information on your building project. To ensure our emails always make it to your inbox, please be sure to whitelist us. If you’re unsure how to do so, simply follow these instructions. Be sure to check your spam folder or promotions folder in Gmail if you do not see our email in your inbox.
Follow these instructions

One of our specialists will call you soon.

Your inquiry has been received by a steel building expert familiar with projects in your state. Your assigned expert will be calling you soon, usually within the next business day, at the number you provided to go over your quote request and answer any questions you may have. If you would like to speak with someone about your quote request immediately, please call 1-800-345-4610.

So, what happens next?

  • phone-new

    A Steel Building Expert Will Call You

This is a quick 10-minute conversation to gather a bit more information and answer any questions you may have.
You can also call us toll free at 866-963-2118.

  • Notes-new

    Review Details & Confirm Steel Prices

It's not as scary as it sounds. Your Steel Building Expert will put you in touch with a local authorized builder or assist you with your needs right here out of corporate. Simply review the details of your building and place your order with a small deposit. You are now on your way to putting up your dream building!

  • Plan-new

    Design Your Dream Building

You'll be assigned a project manager who will send you a comprehensive direct pricing catalog should you decide to select additional accessories. They'll even make recommendations on where to purchase accessories in your area should you decide you'd rather source them locally. Once you've released your building into the fabrication schedule, you're able to quickly schedule a delivery date that works best for you.

  • Vehicle-new

    Take Delivery!

Once you're ready to take delivery of your building, we'll work together to schedule a date that works best for you. You'll need a forklift to properly unload your building system. If you have any questions during the assembly process, we're just a phone call away! Otherwise, enjoy being a proud owner of your new Armstrong Steel Building System!

Endorsed by Construction Leaders

Mask group

Frequently Asked Questions

Am I really buying direct from the factory?

Search Results for: project manager

In this series First Time Builder: A-Z list of Essentials, Jeremy Bjork will detail several issues facing some of his most important clients, first time builders such as yourself. Jeremy will answer common questions and provide you with simple and affordable solutions to common situations. Jeremy works as a Senior Level Project Manager at Armstrong Steel in Denver, Colorado. He is responsible for managing building projects for both established and first time builders. He consistently integrates the newest building designs and efficiencies to assist the budget conscious builder. He is focused on personal and professional relationships, project budgets, timelines, and organizational performance; with special care and consideration to first time builders or builders who may not have unlimited budgets. Jeremy encourages first time builders to write to him with questions and comments, or details of your experience as a first time builder.

You might be surprised to learn that the first question you should ask yourself when you are planning a first time building project isn’t, “which architect should I hire,” but rather, “why should I hire an architect?”

If you are building a simple structure – a garage or workshop, perhaps – the conservative talents of a structural engineer are likely all you will need. A fancy roof or an intricate door frame looks great on paper but can cost thousands of dollars in engineering and construction. A few design lines here or there can quickly add up. These are the types of creative options that will take your easily erected project from the affordable category of ‘pre-engineered’ – to the high-cost category of ‘custom-design.’

I always remind people that a good structural engineer can make all the design changes you will ever need. Indeed, if you can imagine it, a structural engineer can do it. That doesn’t mean that you need to skimp on aesthetics. An architect or a designer can always be hired to add beauty elements once the important part of the process – building a sound structural system – has been completed. To put it another way, you should write the story before you ever think about drawing the pictures.

As a first time builder you should always be mindful that your skill set and resources are often limited. Your project probably won’t require the great visions of an architect. You should always consult, first, with a project manager, like me, who will help you create a first-time building project that fits within your budget, your building’s purpose, and your skill level. The services of a structural engineer are often included in the cost of your project management, so there isn’t a need to find one on your own.

From the Taj Mahal to the Roman Coliseum, there is a reason that great architecture is considered an art form; because it’s created at the whim and fancy of creative people who rarely consider cost an issue. But for most of us, we don’t need an elaborate fresco to cover a blank wall when a simple, functional and affordable coat of paint will do.

To learn more about pre-engineered steel building systems, check out our complete guide to steel buildings!

Search Results for: project manager

It is the most widely used man-made material on the planet and it’s perhaps the most misunderstood. It’s concrete and it’s a necessary component to your first time building project. Whether you opt for a traditional build or the convenience and affordability of a pre-engineered structure for your first time building project, you will need at least some concrete.

First, let me just clear up one big misconception, there is a difference between cement and concrete. In a nutshell, cement is any type of binder that holds materials together. It is construction glue if you will. Concrete is cement mixed with aggregates such as sand, gravel, small rocks and water. It is then left to harden – or cure. But this is trivial knowledge which may only assist you in a game of bar trivia because when you place an order for ‘cement,’ for your project it is likely your vendor will still know that you’re ordering concrete.

The second thing you must know is that a concrete wall or floor is so much more than just a thick slab placed on the ground. Sure, it looks like a gigantic and simple chunk of hardened smooth rock, but it is actually a carefully engineered piece of performance material, and it will require the specialized skills of a professional to design, mix, pour, and set.

Concrete is purchased by the cubic yard. Once you have worked with your project manager and structural engineer and have settled on the above ground portion of your building project it is then time to plan what this structure will set upon.  At this point you will need to deal with a civil engineer or an engineer that specializes in foundations and concrete. This engineer will help you determine how much of the material you will need.

Just as choosing a local builder for his convenient proximity for your first time building project, it is also recommended that you choose a local civil engineer. A local engineer comes with an intimate knowledge of soil types, climate issues, and geo-technical data such as minimum seismic activity requirements. You can, of course, choose an engineer from outside your area because they appear less expensive, but keep in mind that this may cost you more money in the long run because it is probable that they will design your concrete load requirements with the highest level of standards required by your county or state.

This means that you should choose to pay a few hundred extra dollars for a local civil engineer who can design a more efficient concrete system specific to your exact location, saving you thousands in materials that can be considered overkill.

Concrete systems require concrete, obviously, but they also require things like rebar, clips, hairpins, anchor bolts and a whole assortment of other materials which cost money. There is no reason to pay thousands of dollars for a concrete slab which will withstand heaving clay laden soil if your building site is on stable ground, for instance.

In terms of planning your schedule, you must also keep in mind that concrete needs time to cure. The longer it cures, the stronger it becomes. Do not plan on laying concrete on a Friday and begin constructing the top structure on Monday morning. There are ways to decrease the curing time – choosing a heavier grade concrete which will give you the minimum grade requirement in a shorter amount of time, for instance – but as a general rule, you should plan on at least two weeks minimum for sufficient cure time – longer if possible.

Planning also requires that you are mindful of climate and temperature. It is best to pour concrete between 45 degrees and 85 degrees Fahrenheit. The colder it is, the longer it will take the concrete to dry. Rainy summers will also create a problem as you do not want your concrete to be engulfed with water. Water is a key ingredient to an effective concrete mixture so adding additional water will disrupt your water/dry material ratio. This could lead to cracking in the future or diminished performance of the concrete.

It is important to note that because of increased global industrialization, concrete has become very expensive in recent years. In fact, it has been the victim of one of the highest price increases of construction materials. For this reason, it is important that you plan, plan, and plan again leaving little room for a mistake or a ‘do-over.’

While most of us see concrete as a simple stone-like piece of material it is actually a critical and dynamic working system which must be engineered and poured by professionals who understand its properties. For your first building project, this one of the few times I will advise that you do not attempt to complete this phase on your own – and that’s the concrete truth.

Share this blog with other first time builders considering pouring concrete on their own. You might save them from a costly headache. Please share with us your concrete horror stories and what you have learned.

Need Space? Considering a steel building? Check out other First Time Builder resources.

Search Results for: project manager

A 2013 report from the Association of General Contractors details something you may already know, construction firms and subcontractors across the nation are turning down new work. The report says that current work for existing clients is keeping small to medium sized contractors as busy as ever. With housing and building starts seeing a dramatic rise in 2014, contractors are finding it more and more difficult to meet a climbing demand.

“In our industry right now, we’re experiencing a real surge of activity,” said Aaron Janikker, VP at Wolf Build Group, a Midwestern contracting company. “Companies are getting stretched to the limit.”

Many contractors are taking a more responsible approach to growth, learning from the lessons of the last recession; not wanting to find themselves overextended as they were in the early part of the last decade when the bottom fell out and resources were stretched; customers were slow to pay; and jobs sat incomplete for months.

The message to developers who might require construction services in the next year: You may not be able to get your project done as quickly as you’d hoped.

Another reason for declining work is that contractors in many states are finding it increasingly difficult to find skilled or licensed tradesmen. In the Midwest, the industry lost a lot of capacity during the recession as companies closed up shop and as skilled tradesmen left slow-growth states to follow work to areas with greater prosperity.

Michigan, for instance, peaked at 214,200 construction workers in April 2000. The industry lost nearly 41 percent of its workforce through August of 2013, according to the most recent Association of General Contractors (AGC) data.

An AGC analysis of U.S. Census data found the nationwide unemployment rate for people looking for work who had last been employed in the construction industry fell to 9.1 percent in August of 2013 from 11.3 percent a year before, the lowest August figure since 2008. Overall construction employment was nearly 5.8 million nationwide for August 2013, up 3 percent from 2012, but “nearly flat” since March of 2013.

My analysis of this situation is that companies that weathered the recession are satisfied with the state of their companies today, and it seems that they’re taking a very conservative approach, this time, to how they grow.

Wolf Building is actually turning down work and focusing on existing clients that have projects on the drawing boards. In some cases, Janniker said the company is suggesting that clients hold off on their projects until summer of 2014 or later if they can.

“We’re not in the bid market right now,” he said. “We’re seeing that existing clients are happy and moving forward with their projects. We get phone calls every day, and we have to say, ‘Thanks, but right now we’re not going to be able to help.’”

With the memory of the recession fresh in the collective minds of construction executives, it must be difficult to turn down work, but as a business leader, I can attest that sometimes, it’s just about being prudent.

The good news is that in order to keep up with the workload, many contractors are hiring new employees, which is helping local economies with the ripple effect of decreased unemployment.

A national AGC study showed that 46 percent of firms surveyed had increased the size of their professional staff in the last 12 months, while 55 percent added tradesmen. Twenty-one percent of respondents said they were having trouble hiring in all professional and skilled worker positions, while 28 percent reported difficulty filling tradesmen positions only.

Nearly half of respondents, 48 percent, said they expected it to be harder to find tradesmen in the next year.  Sixty-five percent of respondents said the pipeline for preparing new craft workers was below average or poor.

By doing some digging, general contractors can find project managers and superintendents, but subcontractors are struggling to find people, especially in a few of the skilled trades such as concrete and plumbing, the report details.

The AGC report goes on to note that 74 percent of survey respondents believe the pool of craft workers is insufficient to meet the needs of construction demand in the next year.

WOW! This means it’s a good time to be a construction worker because you can expect wages to begin to rise. Because of increased demand for skilled trades, fifty-six percent of contractors expect to increase wages for skilled labor, according to the AGC.

With fewer crews available, the costs for general contracting firms are ticking up slightly. Inflation is hitting materials prices, concrete in particular. Nationally, building material costs are up 3 percent over the same time last year, according to the Engineering News-Record’s 20-city Cost Index. Experts are not worried about already high construction costs spiking further. In fact, ENR believes the current market will spawn a cycle of new businesses that will fill demand in market. The last time this happened was about 10 or 12 years ago.

The reports indicate that demand has increased a lot faster than the capacity to do the work. With many companies declining work, we can probably expect to see some new companies crop up and say, ‘We’ll bid this, we want to do this work.’

As a contractor or sub-contractor, have you found that you have had to decline business? What are some of the reasons you have declined business?

If you are in the market to hire a contractor, have you encountered contractors who seem to be less than eager to start your project? Do you think this is good or bad for the industry?